Nevada Bids > Bid Detail
Pavilion Center Dr. and Oakey Blvd Safety Improvements (Complete Streets Program FY23)
Agency: | Nevada Government eMarketplace (NGEM) |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD18750915223578552 |
Posted Date: | Nov 9, 2023 |
Due Date: | Nov 16, 2023 |
Solicitation No: | 23.MWB025-DG |
Source: | https://nevada.ionwave.net/Pub... |
Bid Information
|
Contact Information
|
Bid Attachments
File Name | Description | File Size | ||||
| ||||||
ITB Instructions Offsite.pdf (please login to view this document) |
Instructions to Bidders for submitting a Response to this Invitation to Bid. | 428 KB | ||||
Contract OffSite 23.MWB025-DG.pdf (please login to view this document) |
Terms, conditions and specifications that will govern any contract resulting from this solicitation. | 455 KB | ||||
Special Provisions 23.MWB025-DG.pdf (please login to view this document) |
Written descriptions of the requirements for the Work, to be incorporated as a part of the Contract.
|
6.89 MB | ||||
23.MWB025-DG Plan Sheet Index.pdf |
Plan Sheet Index | 444 KB | ||||
Plans 23.MWB025-DG.pdf (please login to view this document) |
Diagrammatic representations of the requirements for construction of the Work, to be incorporated as a part of the Contract. | 27.29 MB | ||||
23.MWB025-DG RESPONSE ATTACHMENTS 1.1-1.3.pdf (please login to view this document) |
Attachments 1.1 through 1.3, which must be submitted WITH THE BID. See ITB 6 of the ITB Instructions for more information on this requirement. DOWNLOAD AND SAVE these Attachments prior to completing and uploading to the Response Attachments Tab. | 995 KB | ||||
23.MWB025-DG RESPONSE ATTACHMENTS 2.1-2.2.pdf (please login to view this document) |
Attachments 2.1 and 2.2, which must be submitted by the 3 Low Bidders WITHIN 2 HOURS of completion of Bid opening. See ITB 7 for more information on this requirement. DOWNLOAD and SAVE these attachments prior to completing this form. | 750 KB | ||||
23.MWB025-DG RESPONSE ATTACHMENTS 3.1-3.3.pdf (please login to view this document) |
Attachments 3.1, 3.2 & 3.3, which must be submitted by the 3 Low Bidders WITHIN 1 BUSINESS DAY of completion of Bid opening. See ITB 8 for more information on this requirement. DOWNLOAD and SAVE these attachments prior to completing this form. | 964 KB | ||||
23.MWB025-DG RESPONSE ATTACHMENT 4.1 Request for Waiver Form.pdf (please login to view this document) |
Attachment 4.1, which must be submitted by the Low Bidder WITHIN 10 BUSINESS DAYS of completion of Bid opening. See ITB 8 for more information on this requirement. DOWNLOAD and SAVE this attachment prior to completing this form. | 721 KB | ||||
23.MW0B25-DG Reference_Only BID Line Items.xlsx |
Bid Line Items REFERENCE ONLY | 12 KB |
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.