Nevada Bids > Bid Detail

Baggage Handling System Modernization

Agency: Nevada Government eMarketplace (NGEM)
Level of Government: State & Local
Category:
  • 17 - Aircraft Launching, Landing, and Ground Handling Equipment
  • 20 - Ship and Marine Equipment
  • 70 - General Purpose Information Technology Equipment (including software).
Opps ID: NBD18750289898689919
Posted Date: Jun 15, 2023
Due Date: Jul 13, 2023
Solicitation No: FAA PLA LAS C/E - 2485 (PWP CL-2023-279)
Source: https://nevada.ionwave.net/Pub...

Bid Information



Type
CCDOA Construction: Invitation to Bid (Sealed)
Status
Issued
Number
FAA PLA LAS C/E - 2485 (PWP CL-2023-279) (Baggage Handling System Modernization)
Issue Date & Time
6/15/2023 01:43:59 PM (PT)
Close Date & Time
7/13/2023 01:30:00 PM (PT)
Time Left
27 days 18 hours 9 minutes 16 seconds
Notes

Public Works Project (PWP)# CL-2023-279



PROJECT DESCRIPTION

THIS IS A PROJECT LABOR AGREEMENT (PLA) PROJECT.PROJECT GOAL




This is a federally assisted contract and therefore is subject to 49 CFR Part 26, Participation by Disadvantaged Business Enterprises in Department of Transportation Financial Assistance Programs.




OWNER has established a DBE goal of 9.5% of the Contract amount for the Base bid.


NAICS codes applicable to this work are as follows:


238210 - Electrical Contractors

238290 - Other Building Equipment Contractors

333922 - Conveyor and Conveying Equipment Contractors


PROJECT DESCRIPTION



Task 1: Inbound Conveyors; Upgrade of eight inbound Baggage Handling System (BHS) bag claim carousel units at T-1 and replace entirely eight inbound BHS bag claim carousel units at T-1. This scope includes but is not limited to a total of 32 in-feed conveyors on 16 units, motor controls, control systems, and supporting hardware, including interfaces to the Johnson Controls Inc (JCI) security system and supporting CCTV. Reference technical specifications and drawings for more details.

Task 2: Installation of Inbound Cameras. Reference technical specifications and drawings for more details.

Task 3: Power Relocation at T-1; Reconfigure standby generator power at T-1 to select ticket counters and oversize conveyors to allow “trickle” operations during utility power interruption. Includes the installation of a new control panel for standalone system operation and modification of emergency stop circuits. Reference technical specifications and drawings for more details.

Task 4: UPS at T-1; Run network conduit and cabling to each uninterruptible power supply (UPS) units serving the BHS (to support future SCADA capability) at T-1 and integrate into owners existing maintenance diagnostic systems software package (MDS). Reference technical specifications and drawings for more details.

Task 5: T-3 Recontrol; Upgrade all BHS Supervisory Computers and Outbound PLCs at T-3. Reprogram per Owner specifications all outbound and inbound PLCs at T-3. This scope includes the installation of a new control panel as well as new device level networking for all BHS devices. Reference technical specifications and drawings for more details.




Task 6: Removal and replacement of oversized and curbside conveyors at Terminal 1.



Task 7: New column covers at the Terminal 1 baggage claim carousels.

The carousel phasing is limited to one large carousel and one small carousel closure at a time. Completion of all work in each phase must be complete to substantial completion before proceeding to the next phase, including demolition and installation of carousel as well as power relocation, conveyors, Johnson Controls Inc (JCI) security interface, interface displays, configuration, programing, owner testing, functional testing, and commissioning including installation of column covers. Reference contract drawing and specifications for complete scope.

CONTRACTOR’s work on T-1 oversize and curbside conveyor replacement shall impact no more than (1) airline at any given time.

Site investigations are required and are to identify all impacts associated with the contract scope of work including, but not limited to Tasks 1-7, prior to Milestone 7 Contract Day 270. Schedule no less than 75 days of dedicated site investigations of the Contractor work to be completed before Milestone 6. Contractor to provide dedicated and adequate resources to investigate all impacts associated within the scope of work including but not limited to electrical, data, communications, security, and fire systems. Failure to identify all material impacts during site investigation may result in delays and costs which costs will be the responsibility of the Contractor.

Contractor shall include in the bid the cost for a full-time onsite Contractor Coordination Person (CCP) or Team for the duration of the project up to substantial completion. The CCP will be required to address daily and ongoing coordination efforts any additional site investigation with all stakeholders including but not limited to Baggage Handling, Information Systems, Electrical, Airlines, Security, TSA, as deemed necessary by Owner to complete this scope of work.

Temporary 8-foot-tall construction wall to be constructed at T-1 baggage carousel area, with graphic coverage to be no less than 50% of wall. See phasing plan for reference. Graphics to be approved by Owner.

Work that affects airport operations will need to be coordinated so that the work can be completed with the least amount of impact to airport operations. Some tasks may require alternate work durations and shifts to accommodate this requirement.

Contractor shall schedule all interruptions in advance with adequate time to notify all affected by the interruption. Contractor may be billed for impacts not planned for and approved in advance resulting in additional cost to the Owner, TSA or the Airlines.

Permit and Fees, Contractor is responsible for procurement of all permits and certificates required by the relevant agencies, applicable to constructing and upon completion, utilization of this facility by Owner including but not limed to: Plan Check fee(s) , Building Permit(s), Electrical Permit(s), Mechanical Permit(s), Plumbing Permit(s), Fire Protection Permit(s), Temporary Occupancy Certificate(s), Manufacturer Certification(s), Security Certification(s).

CONTRACTOR shall provide to OWNER a complete list of the Fixed Assets for this project. CONTRACTOR shall assist OWNER to have OWNER provided asset tags affixed in a reasonably visible location acceptable to OWNER.



The proposed Contract is under and subject to Executive Order 11246, as amended, of September 24, 1965, and to the Equal Employment Opportunity (EEO) and Federal Labor Provisions.




It is the policy of the Clark County Department of Aviation (OWNER) to promote the objectives of the United States Department of Transportation (DOT) with respect to the participation of Disadvantaged Business Enterprises (DBEs) in DOT-assisted contracts. This policy has been formulated to comply with 49 CFR Part 26 and Instruction to Bidders, Article 6.0, section 6.3.H. Guidance Concerning Good Faith Efforts.



Award of the Contract is conditioned on meeting the requirements for good faith efforts as defined in CFR 49 26.53. The DBE goal remains in effect throughout the term of the Contract.

The requirements of 49 CFR part 26 apply to this Contract. It is the policy of the OWNER to practice nondiscrimination based on race, color, national origin, sex, or sexual orientation in the award or performance of this contract. The OWNER encourages participation by all firms qualifying under this solicitation regardless of business size or ownership.

The OWNER, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. §§ 2000d to 200d-4) and the Regulations, hereby notifies all Bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

The following Federal provisions are incorporated into the contract by reference: 1) Buy American Preference, 2) Foreign Trade Restriction, 3) Davis Bacon, 4) Affirmative Action, 5) Governmentwide Debarment and Suspension, 6) Governmentwide Requirements for Drug-free Workplace.

The proposed Contract is under and subject to Executive Order 11246, as amended, of September 24, 1965, and to the Equal Employment Opportunity (EEO) and Federal Labor Provisions.

All labor on the project shall be paid no less than the minimum wage rates established by the U.S. Secretary of Labor and the State of Nevada.

The EEO requirements, labor provisions and wage rates are included in the specifications and bid documents and are available for inspection at the Department of Aviation, Harry Reid International Airport, Contracts Office, 1845 East Russell Road, 3rd Floor, Las Vegas, Nevada, 89119.

Each Bidder must supply all the information required by the bid documents and specifications.

Each Bidder must furnish a Bid Guarantee equivalent to the appropriate percentage of the Bid Price described in Instructions to Bidders, Article 11.2, of the Contract documents. The "Bid Guarantee" shall consist of a firm commitment such as a Bid Bond, certified check, or other negotiable instrument accompanying a Bid as assurance that the Bidder will, upon acceptance of his Bid, execute such contractual documents as may be required within the time specified.

The successful Bidder agrees to furnish a performance bond for 100 percent of the Contract price. This bond is one that is executed in connection with a Contract to secure fulfillment of all the Bidder's obligations under such Contract.

The successful Bidder agrees to furnish a payment bond for 100 percent of the Contract price. This bond is one that is executed in connection with a Contract to assure payment as required by law of all persons supplying labor and material in the execution of the work provided in the Contract.

OWNER reserves the right to refuse to issue a bid form, or to accept a bid from a prospective Bidder should such Bidder be in default for any of the following reasons:

Failure to comply with any pre-qualification regulations of OWNER, if such regulations are cited, or otherwise included, in the proposal as a requirement for bidding; or

- Failure to pay, or satisfactorily settle, all bills due for labor and materials on former contracts in force (with OWNER) at the time OWNER issues the proposal to a prospective Bidder; or

- Contractor default under previous contracts with OWNER; or

- Unsatisfactory work on previous contracts with OWNER.

BOARD OF COMMISSIONERS

CLARK COUNTY, NEVADA


Contact Information
Name
Brandon Ledesma
Address
Administration Building
1845 E Russell Road
Las Vegas, NV 89111 USA
Phone
(702) 261 x5574
Fax
Email
contracts@LASairport.com




Bid Documents







Document name Format


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50



1 items in 1 pages

Bid Invitation

Acrobat / PDF


Bid Attachments





















File Name Description File Size


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50



35 items in 3 pages

1. 2485 - Volume One - Cover_Index_Instructions to Bidders.pdf
Volume One - Cover_Index_Instructions to Bidders 1.04 MB

2. 2485 - ITB_Attachment A SMWDBE SUBCONTRACTOR INFO PART 1.pdf
ITB_Attachment A SMWDBE SUBCONTRACTOR INFO PART 1 75 KB

3. 2485 - ITB_Attachment B_SMWDBE SUBCONTRACTOR INFO PART 2.pdf
ITB_Attachment B_SMWDBE SUBCONTRACTOR INFO PART 2 668 KB

4. 2485 - ITB_Attachment C_DESIGNATION OF SUBCONTRACTORS 1% LIST.pdf
ITB_Attachment C_DESIGNATION OF SUBCONTRACTORS 1% LIST 217 KB

5. 2485 - ITB_Attachment F_SMWD BUSINESS ENTERPRISE UTILIZATION.pdf
ITB_Attachment F_SMWD BUSINESS ENTERPRISE UTILIZATION 148 KB

6. 2485 - ITB_Attachment H_CONSTRUCTION EQUIPMENT_NGEM.pdf
ITB_Attachment H_CONSTRUCTION EQUIPMENT_NGEM 56 KB

7. 2485 - ITB_Attachment I - PWP RATES 2023 & AMENDMENTS 1-9.pdf
ITB_Attachment I - PWP RATES 2023 & AMENDMENTS 1-9 1.96 MB

8. 2485 - ITB_Attachment I-1 Davis-Bacon Wages NV Clark Heavy 4-23 and Highway 5-23.pdf
ITB_Attachment I-1 Davis-Bacon Wages NV Clark Heavy 4-23 and Highway 5-23 139 KB

9. 2485 - ITB_Attachment J_PROJECT WORKFORCE CHECKLIST.pdf
ITB_Attachment J_PROJECT WORKFORCE CHECKLIST 670 KB

10. 2485 - ITB_Attachment K_REQUEST FOR WAIVER.pdf
ITB_Attachment K_REQUEST FOR WAIVER 205 KB

11. 2485 - ITB Attachment L - PLA - Drug Testing Rates.pdf
ITB Attachment L - PLA - Drug Testing Rates 165 KB

12. 2485 - ITB Attachment M - PLA -Auth..pdf
ITB Attachment M - PLA -Authorization 8.40 MB

13. 2485 - ITB_Attachment_N_Sample_LAS_Construction_Waste_Recycling_Sheet (Part of Ex A).xlsx
ITB_Attachment_N_Sample_LAS_Construction_Waste_Recycling_Sheet (Part of Ex A) 14 KB

14. 2485 - Volume One - Contract.pdf
Volume One - Contract 101 KB

15. 2485 - Volume One - Exhibit A - General Conditions.pdf
Volume One - Exhibit A - General Conditions 434 KB


TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >