Nevada Bids > Bid Detail
EV Charging-Multiple Sites
Agency: | Nevada Government eMarketplace (NGEM) |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD18750228861411046 |
Posted Date: | Jan 11, 2024 |
Due Date: | Feb 14, 2024 |
Solicitation No: | 23.69111.06-DD |
Source: | https://nevada.ionwave.net/Pub... |
Bid Information
|
Contact Information
|
Bid Attachments
File Name | Description | File Size | ||||
| ||||||
ITB Instructions On-Site - revised 1-11-24.pdf (please login to view this document) |
Instructions to Bidders for submitting a Response to this Invitation to Bid. | 1.68 MB | ||||
Contract_On-Site_NGEM revised 1-11-24.pdf (please login to view this document) |
Terms, conditions and specifications that will govern any contract resulting from this solicitation. | 1.47 MB | ||||
Specifications EV Charging - Multiple Sites - Division 1 Bid Set.pdf (please login to view this document) |
Written descriptions of the requirements for the Work, to be incorporated as a part of the Contract | 477 KB | ||||
Drawing List.pdf (please login to view this document) |
A list of the project Drawings included in Exhibit D, to be incorporated as a part of the Contract | 414 KB | ||||
Drawings Fire Station 108 & East Yard.pdf (please login to view this document) |
Diagrammatic representations of the requirements for construction of the Work, to be incorporated as a part of the Contract | 9.58 MB | ||||
Additive Alternates 1 through 3.pdf (please login to view this document) |
Additive Alternates 1 through 3 | 7.96 MB | ||||
RESPONSE ATTACHMENTS Req with On-Site Bid revised 1-11-24.pdf (please login to view this document) |
Attachments 1.1 through 1.3, which must be submitted WITH THE BID. See ITB 6 of the ITB Instructions for more information on this requirement. DOWNLOAD AND SAVE these Attachments prior to completing and uploading to the Response Attachments Tab. |
675 KB | ||||
RESPONSE_ATTACHMENTS_Req_WITHIN_2_HRS (11).pdf (please login to view this document) |
Attachments 2.1 and 2.2, which must be submitted by the 3 Low Bidders WITHIN 2 HOURS of completion of Bid opening. See ITB 7 for more information on this requirement. DOWNLOAD and SAVE these attachments prior to completing this form. | 779 KB | ||||
RESPONSE_ATTACHMENTS_Req_WITHIN_1_DAY_NGEM_On-Site revised 1-11-24.pdf (please login to view this document) |
Attachments 3.1, & 3.2, which must be submitted by the 3 Low Bidders WITHIN 1 BUSINESS DAY of completion of Bid opening. See ITB 8 for more information on this requirement. DOWNLOAD and SAVE these attachments prior to completing this form. | 715 KB | ||||
Schedule of Values Form - EV Charging.xlsx (please login to view this document) |
Attachment 3.3, which must be submitted by the 3 Low Bidders WITHIN 1 BUSINESS DAY of completion of Bid opening. See ITB 8 for more information on this requirement. DOWNLOAD and SAVE this attachment prior to completing this form. | 11 KB |
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.