Nevada Bids > Bid Detail

CMAR for DPS Unit 5 & 6 Restroom Addition

Agency: Nevada Government eMarketplace (NGEM)
Level of Government: State & Local
Category:
  • S - Utilities and Training Services
Opps ID: NBD18750617281557626
Posted Date: May 8, 2023
Due Date: May 23, 2023
Solicitation No: 23.MWA949.C1-SK
Source: https://nevada.ionwave.net/Pub...

Bid Information





Type
Request for Proposal
Status
Issued
Number
23.MWA949.C1-SK (CMAR for DPS Unit 5 & 6 Restroom Addition)
Issue Date & Time
5/8/2023 05:16:43 PM (PT)
Close Date & Time
5/23/2023 01:30:00 PM (PT)
Time Left 14 days 18 hours 59 minutes 24 seconds
Notes

The City of Las Vegas (“Owner”) hereby invites interested persons or organizations, qualified as a construction manager/general contractor (“Applicants”), to submit written Proposals for the performance of construction manager at risk services for the DPS Unit 5 & 6 Restroom Addition Project (“Project”). Unit 5 & 6 at the City's detention facility will get individual restroom units installed in each cell within the facility. Currently, there are gang restrooms located at the center of the facility that will be converted to a new shower area and office space for the rest of the space. A wall will be built to divide the unit into two separate units, with a reconfiguration of the security control room with the addition of a restroom to this location.

PWP No: [ CL-2023-355 ] Estimated Project Cost: $6,000,000 to $8,000,000.

Preconstruction Services shall include constructability reviews, construction cost estimates, advice, project analysis and feedback regarding materials, methods, systems, schedule, labor and other conditions affecting construction and subcontractor selection for development and construction of the Project.

Preconstruction services are anticipated to begin 7/2023 and construction is anticipated to begin 10/2023 with estimated completion 4/2024.



Persons with a disability may request accommodations or assistance to participate in the solicitation process by contacting Purchasing & Contracts at 702-229-6231 or 7-1-1 (TTY). To insure the City is able to meet your needs, please submit requests at least 2 business days in advance.

Contact Information
Name
Steve Kessler
Address
495 South Main Street
Las Vegas, NV 89101
Phone
1 (702) 229-1827
Fax
1 (702) 464-5771
Email
skessler@lasvegasnevada.gov





Bid Attachments















File Name Description File Size

Instructions to Applicants CMAR.pdf (please login to view this document)
Instructions for RFP participation and submittal of Proposals 193 KB

Project Details & Proposal Format 23.MWA949.C1-SK.pdf (please login to view this document)
Project-specific information including evaluation criteria and guidelines for Proposal content 191 KB

Pre-Construction Contract 23.MWA949.C1-SK.pdf (please login to view this document)
Terms, conditions and specifications that will govern any contract resulting from this solicitation. 330 KB

Construction Contract 23.MWA949.C-SK.pdf (please login to view this document)
Terms, conditions and specifications that will govern any contract resulting from this solicitation. 567 KB

Attachment 1 - Certification.pdf (please login to view this document)
Required submittal - download and save this form prior to filling it out. Completed form must be included in the Proposal 74 KB

Attachment 2 - Example Projects.pdf (please login to view this document)
Required submittal - download and save this form prior to filling it out. Completed form must be included in the Proposal 2.10 MB

Attachment 3 - Key Personnel.pdf (please login to view this document)
Required submittal - download and save this form prior to filling it out. Completed form must be included in the Proposal 113 KB

Attachment 4 - Bidders Preference Affidavit.pdf (please login to view this document)
Download and save this form prior to filling it out. Proposals received without a completed Affidavit will not be eligible for the bidders preference 28 KB

30% Prog Set 23.MWA949.C1-SK.pdf (please login to view this document)
30% Progress Drawings –Not For Construction 23.29 MB

Construction Bonds.pdf (please login to view this document)
Examples of the bonds that will be required upon award of a construction contract 147 KB


TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >