Nevada Bids > Bid Detail

Construction Manager At Risk (CMAR) for SCS Data Center Secondary Power Source Services Addendum 1

Agency: Nevada Government eMarketplace (NGEM)
Level of Government: State & Local
Category:
  • 10 - Weapons
Opps ID: NBD18750477544624006
Posted Date: Mar 7, 2023
Due Date: Apr 6, 2023
Solicitation No: 845-FH
Source: https://nevada.ionwave.net/Pub...

Bid Information



Type
Construction Manager At Risk
Status
Issued
Number
845-FH Addendum 1 (Construction Manager At Risk (CMAR) for SCS Data Center Secondary Power Source Services)
Issue Date & Time
3/1/2023 08:00:00 AM (PT)
Close Date & Time
4/6/2023 02:00:00 PM (PT)
Time Left 29 days 18 hours 17 minutes 36 seconds
Notes
UNLV is seeking experienced and qualified CONSTRUCTION MANAGER AT RISK (CMAR) FOR UNLV SCS Secondary Power Source in support of the Planning and Construction Department.


PLEASE NOTE: FOR PUBLIC WORKS PROJECTS, A BIDDER MUST BE QUALIFIED AS A BIDDER WITH THE STATE PUBLIC WORKS DIVISION OF THE DEPARTMENT OF ADMINISTRATION FOR THE COST CATEGORY REQUIRED FOR THE PROJECT. PLEASE REFER TO http://publicworks.nv.gov/Bids/Bids/.



A MANDATORY Site Visit will be held on Wednesday, March 08, 2023 at 10:00am (PST) at the following location. System Computing Services Building - 4505 S Maryland Pkwy, Las Vegas, NV 89154. (See Attachment Map in NGEM for Directions.) Meet representatives from UNLV Planning & Construction (P&C) and/or Purchasing at entrance to sign-in for the Mandatory Site Visit.



Contact Information
Name
Frances Heiy Sr. Purchasing Analyst
Address
4505 S Maryland Parkway
Campus Services Building, Room 235
Las Vegas, NV 89154-1033 USA
Phone
(702) 895-1263
Fax
Email
Frances.Heiy@unlv.edu





Bid Attachments





















File Name Description File Size


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50



28 items in 2 pages

Addendum No. 1 Site Walk Location Map.pdf
Pre-Bid Site Walk Location Map 4 MB

845-FH CMAR SCS Secondary Power Source .pdf
CMAR RFP Document 932 KB

CMAR Exhibit A - Form Contract - Preconstruction.pdf
Exhibit A - Preconstruction Agreement 777 KB

CMAR Exhibit B - Form Contract - Construction Agreement.pdf
Exhibit B Construction Agreement 685 KB

23 07 00 HVAC INSULATION.pdf
Exhibit C - 1 of 24 37 KB

23 23 00 REFRIGERANT PIPING.pdf
Exhibit C - 2 of 24 65 KB

26 00 00 BASIC ELECTRICAL REQUIREMENTS.pdf
Exhibit C - 3 of 24 58 KB

26 05 03 EQUIPMENT WIRING CONNECTIONS.pdf
Exhibit C - 4 of 24 59 KB

26 05 05 SELECTIVE DEMOLITION FOR ELECTRICAL.pdf
Exhibit C - 5 of 24 81 KB

26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES.pdf
Exhibit C - 6 of 24 76 KB

26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS.pdf
Exhibit C - 7 of 24 63 KB

26 05 28 SEISMIC RESTRAINT.pdf
Exhibit C - 8 of 24 65 KB

26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS.pdf
Exhibit C - 9 of 24 92 KB

26 05 73 OVERCURRENT PROTECTIVE DEVICE COORDINATION AND ARC-FLASH STUDY.pdf
Exhibit C - 10 of 24 70 KB

26 22 00 LOW-VOLTAGE TRANSFORMERS.pdf
Exhibit C - 11 of 24 66 KB


TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >