Nevada Bids > Bid Detail
Adcock-Garside Safe Routes
Agency: | Nevada Government eMarketplace (NGEM) |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD18750024426534253 |
Posted Date: | Mar 14, 2023 |
Due Date: | Apr 6, 2023 |
Solicitation No: | 23.MWA065C1-SK(rev) |
Source: | https://nevada.ionwave.net/Pub... |
Bid Information
|
Contact Information
|
Bid Attachments
File Name | Description | File Size |
ITB Instructions NDOT Offsite.pdf (please login to view this document) |
Instructions to Bidders for submitting a Response to this Invitation to Bid. | 407 KB |
Contract 23.MWA065C1-SK(rev).pdf (please login to view this document) |
Terms, conditions and specifications that will govern any contract resulting from this solicitation. | 1.15 MB |
23.70322(rev) MWA065 Special Provisions Adcock-Garside.pdf (please login to view this document) |
Written descriptions of the requirements for the Work, to be incorporated as a part of the Contract | 12.79 MB |
Drawing List 23.MWA065C1-SK(rev).pdf (please login to view this document) |
A list of the project Plans included in Exhibit D, to be incorporated as a part of the Contract | 153 KB |
23.70322(rev) MWA065 Adcock-Garside SRTS Construction Plans.pdf (please login to view this document) |
Diagrammatic representations of the requirements for construction of the Work, to be incorporated as a part of the Contract. | 11.89 MB |
RESPONSE ATTACHMENTS req with NDOT Bid.pdf (please login to view this document) |
Attachments 1.1 through 1.7, which must be submitted WITH THE BID. See ITB 6 of the ITB Instructions for more information on this requirement. DOWNLOAD AND SAVE these Attachments prior to completing and uploading to the Response Attachments Tab. | 3.05 MB |
RESPONSE ATTACHMENT 2.1 1% Subcontractor List.pdf (please login to view this document) |
Attachment 2.1, which must be submitted by the 3 Low Bidders WITHIN 2 HOURS of completion of Bid opening. See ITB 7 for more information on this requirement. DOWNLOAD and SAVE these attachments prior to completing this form. | 649 KB |
RESPONSE ATTACHMENT 3.1 - List of Completed Projects.pdf (please login to view this document) |
Attachment 3.1, which must be submitted by the 3 Low Bidders WITHIN 1 BUSINESS DAY of completion of Bid opening. See ITB 8 for more information on this requirement. DOWNLOAD and SAVE these attachments prior to completing this form. | 672 KB |
RESPONSE ATTACHMENT 3.2 List of Subcontractors Suppliers.pdf (please login to view this document) |
Attachment 3.2, which must be submitted by the Low Bidder WITHIN 1 BUSINESS DAY of completion of Bid opening. See ITB 8 for more information on this requirement. DOWNLOAD and SAVE this attachment prior to completing this form. | 2.26 MB |
Reference Only.pdf (please login to view this document) |
REFERENCE DOCUMENT ONLY - line items and quantities PDF | 647 KB |
Reference Only.xlsx (please login to view this document) |
REFERENCE DOCUMENT ONLY - line items and quantities Excel | 10 KB |
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.